Preventing bridging and rat holes in the hopper before the drying process.
Introducing a case of quicklime bridge in a poor liquidity state and measures taken against rat holes!
We implemented a Brody disk to address the issues of bridging and rat holes in slaked lime with poor flowability before the drying process. This time, it was delivered to the user through a powder system manufacturer. Originally, it was planned to use an air knocker, but at the request of the user, who manufactures a wide range of lime-related products, our bridging and rat hole mitigation equipment was adopted. 【Case Overview】 ■ Material: Slaked lime ■ Moisture content: Approximately 10 percent ■ Hopper diameter: 2000 mm ■ Discharge outlet diameter: 250 mm * For more details, please refer to the PDF document or feel free to contact us. * Our website features numerous case studies, which can be accessed via the link below.
- Company:ミナギ
- Price:Other